4 Months took a man to furnish balconies, all with their own hands. Photos Before / After.

Thank you all for dochityvaniya, put the Huskies and subscribe to our channel! We will be very grateful to you!

When repairing in new building, first of all make the room, bathroom and kitchen renovation begins on the balcony at the last moment. So it was in this case.

After doing all the work in the apartment, the man took hold of the repair on the balcony, and all decided to do the work himself, as extra money was gone again to invite a team of workers.

Now back to the lodge itself, it is very very big, has an interesting shape, one of the walls has a rounded shape, and plus everything else, and panoramic windows. Very spacious and bright place.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

The very first thing the man began to warm a loggia, for this he used penoplex that set on the ceiling and on the perimeter of the outer wall.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

Next top Penoplex laid an additional layer of insulation and started doing crate of timber, in order to was the basis for the skin.

At the same time they began to lay cable for the lighting.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

The floor also made and laid lath plywood sheets, which on one hand will be an additional layer of insulation, the other would be a good basis for finishing.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

Upon completion of the work on warming, began the final finish flat on the floor laid laminate dark brown and This use of the laminate is not over, it has been used for the decoration of the walls, which just made the work on warming.

It is also specially decorated of a step, which was under the windows.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

The remaining panels of wall decorated by brick, the choice was made in favor of the white panels, but not completely white, but closer to beige with dark patches.

Mounted on the ceiling ceilings and installed a couple of ceiling light points.

Windows closed roller blinds, curtains hanging since the landlady did not want on the balcony and not to close a glass area, did not want to.

A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619
A source: https://vk.com/hitrosti_rem? z = photo-134304555_457273981% 2Fwall-134304555_179619

In general, it turned out not very bad, the owners are also very pleased with the result of the work done. Given that the work was done almost 4 months, but do not worry, not every night. Sometimes only after work in the evening, the man was picked, and mostly on weekends.

Of course, many now say that work here for a couple of weeks, but the task was not to hurry, so just let us praise a man for the carefully done a repair.

What would change?

Send us the story of your repair on mail[email protected]if you want to share your results
  • Share: