Thank you all for dochityvaniya, put the Huskies and subscribe to our channel! We will be very grateful to you!
Before we renovated bathroom, which lasted a whole month. All the while the man was doing repairs on their hands, while he already had this experience before repair work, but had to lay tile for the first time.
Before we start the photo finishing, by this time we were lined walls are covered with plasterboard. The bathroom is very large, it will be placed in the room and shower area and a separate bathroom.
The first thing noticed drywall chemicals and prepared for further finishing.
In one corner to make additional moisture protection, because the owner does not want to put the shower, and had planned to do in the floor of the scuppers and slopes to collect water.
This was done, scuppers to collect water installed in a corner and did multilevel livnevki that this water was collected in the right place.
After undertook cladding tiles throughout the bathroom.
After all the work on the decoration of the room in the left corner of the installed extra large bathroom, from which optionally can make a jacuzzi right toilet. The whole room is done in shades of brown, but thanks to the window and more space, which is free, in the room seems to be very light.
Would you like to do in his apartment this repair? Or you would like to change?
Send us the story of your repair on mail[email protected]if you want to share your results.